A deck that stays flat because the frame underneath is built properly, not laid on bare ground and hoped for.

  • Frame set on concrete footings, not just laid on the grass
  • Falls and drainage built in underneath, so water doesn't sit and rot the joists
  • 2-year workmanship warranty on every deck we build
Close/mid detail of composite decking boards on a raised deck fitted with a black cable-wire balustrade and handrail, with a trimmed
  • 2 yearsWarranty on work
  • Owner-ledOne team throughout
  • In-houseBy our own team
  • CSCS · SSSTS · NVQ 2Qualified team

What A Deck Actually Needs Underneath It

A deck is a raised timber or composite platform built on a frame of posts and joists, rather than laid straight onto the ground like a patio. That frame is what decides whether it stays flat, so ours goes down onto concrete footings with the joists spaced and levels checked before a single board is fixed. It suits a garden where a full dig-out is not practical: over roots, on a slope, or wherever the ground beneath needs to be left undisturbed.

Board and Finish — decking installers

How We Build A Deck, In Three Steps

From the first visit to the last board, the frame underneath gets the same attention groundworkers give a footing.

15+

Years in groundworks and landscaping

35 miles

Working radius from our Bournemouth base

Fixed price

Itemised and agreed before anything is dug

Footings

Dug for the frame, not laid on bare ground

Decking Against The Alternatives

Decking, artificial grass and a real lawn all do a similar job in a garden, but they behave differently once they are in. Here is an honest comparison.

DeckingArtificial GrassReal Turf
UpkeepOccasional cleaning and re-oiling or stainingNone once it is laidRegular mowing, feeding and edging
Works on uneven or sloped groundBuilt up on footings, so slopes and drops are not a problemNeeds the ground graded flat firstNeeds the ground graded flat first
Underfoot when it is wetCan be slippery in the wrong boards if not cleanedSheds water fast and stays usable in the rainCan get muddy through a wet winter
Digging into the existing gardenMinimal. Built on footings, not a full dig-outA full sub-base dig-out, similar to a patioNone. Laid onto prepared soil

Swipe to see every column

What Is Included As Standard

The detail that decides whether a deck stays flat, not just how it looks on day one.

Concrete Deck Footings

Posts set on concrete footings dug to depth, not bolted to a slab or bagged into loose soil.

Joists Set Level and Spaced Correctly

The frame is checked for level before a board goes down, so the deck does not bounce or dip later.

Fixed, Itemised Quote

One price agreed before work starts, with nothing added once the job is under way.

2-Year Workmanship Warranty

If anything settles or shifts in the first two years, we come back and put it right.

Pricing

What a Deck Costs

Priced by the frame, not the boards

Most of what a deck costs is the frame and what the frame sits on. Ground that slopes needs more posts and deeper footings. A raised deck needs more again. Board choice matters, but it is the smaller half of the figure. We look at the ground, then quote the whole build in writing.

  • What moves it: deck size, height off the ground, footings and board choice
  • Footings and frame priced in, because that is what keeps it flat
  • Written and itemised before anything is dug
Get a Quote

How A New Deck Gets Built

The same groundworks discipline as a footing, applied to a garden project.

Visit and Measure

We look at the ground, the levels and how the deck will be used, then measure up properly.

Fixed-Price Quote

An itemised quote for the whole job, agreed before anything starts.

Footings and Frame

Concrete footings and joists go in first, checked for level, because that is what the finish sits on.

Board, Finish and Walk-Round

Boards go down, the site is cleared and swept, then a walk-round before we leave. We come back if anything settles.

What Our Garden Customers Say

Feedback from customers we have carried out garden and landscaping work for across Bournemouth and Poole.

Michele Peters-Phillips

11 months ago

What a transformation Jack did to my back garden! I love it, and I couldn't be happier! 😊 All the old decking (that had gone rotten) was ripped up and removed, and replaced with new beautiful porcelain slabs with black edging bricks and railway sleepers. I spoke to Jack about what I needed and he has 100% delivered. There were some awkward bits we came across during the job, but I went with Jack's expert advice. I now have a garden that is not only safe for me and my dog, but is absolutely beautiful. I can't wait to spend time some time out there now 😊. Jack is so polite, friendly, professional and helpful; nothing is too much trouble! I would recommend Jack and Four Groundworks and Landscaping to everyone! I've even got Jack booked in to do some more work for me in the future. Thank you Jack for all your hard work! 😊

Decks as they come off site

Joist spacing and the fall away from the house decide how a deck ages. We post each one to our Instagram as it finishes.

See more on Instagram

Deck Builds Around Bournemouth and Poole

A look at the kind of decking work we take on. More projects are added as they are completed.

What People Ask Before They Book

The practical worries that come up before work starts, answered plainly.

  • Will digging the footings wreck the lawn?

    Footing holes are small, and we make good around them before we leave. It is nothing like the dig-out a patio needs.

  • How long is the garden out of use?

    We agree a timescale at the visit, based on the size of the deck and the ground it is going on, and stick to it.

  • What if it moves or the boards start to gap?

    Everything we build is covered by a two-year workmanship warranty. If it settles or shifts, we come back and put it right.

Decking, Planning and What Affects the Price

Most garden decking in England counts as permitted development and does not need planning permission, as long as it stays under the height limit and does not cover too much of the garden. The exceptions are real: decking close to a boundary is treated differently, and a listed building or a conservation area changes the picture. If in doubt, check before ordering materials, not after.

What a deck costs is driven by its size, how high it sits off the ground, the state of the existing garden, and whether it needs steps, a balustrade or built-in drainage. A raised deck on a slope takes more work in footings and joists than a low deck on level ground, and that is before boards are chosen. Every job here is priced after a look at the actual ground, not from a generic decking cost per square metre, because the ground is rarely generic.

The ground a deck sits on is not always what it looks like from the surface. A garden that seems level can have soft patches, old roots or made-up ground underneath, and that is exactly the layer a set of footings needs to get right. It is also why we look at the ground before quoting a price, rather than after.

Decking Questions, Answered

What we get asked most before a deck goes in.

How much does garden decking cost in Bournemouth?

It depends on the size, height and access of the job, and whether steps or a balustrade are needed. We price every deck after a look at the site rather than from a generic rate. Get in touch for a fixed, itemised quote.

Do I need planning permission for decking?

Most standard garden decking counts as permitted development and does not need planning permission, provided it stays under the height limit and does not cover too much of the garden. Boundaries, listed buildings and conservation areas can change that, so it is worth checking before ordering materials.

Will my deck sink or start to wobble?

Not if the frame underneath is built properly. Ours goes down on concrete footings with the joists checked for level, which is the part that decides whether a deck stays flat.

How long does a new deck take to build?

It depends on the size of the deck and the ground it is going on. We confirm the timescale at the visit and agree it before work starts.

Do you do the groundwork as well as build the deck?

Yes. Footings, levels and drainage are done by the same team that builds and finishes the deck, rather than being subbed out to someone else.

Are you on Checkatrade and Google?

Yes. We are an approved Checkatrade member and hold Google Guaranteed status. Behind that are over 15 years in groundworks and landscaping and the trade cards to go with it: CSCS, Street Works, SSSTS and NVQ Level 2.

Ready to Talk About Your Decking?

Tell us about the space and we will come out, look at the ground, and give you a fixed, itemised quote.

Get a free quote

Tell us what you need and we'll come back with a price. No pressure, no hard sell.

Prefer to talk? Call Four Groundworks & Landscaping on 07886 075828